Innovative Engineering has been awarded Geomechanical work for Ithaca Energy in their Causeway field. The work involved the review of water injection performance and reservoir mechanical response that identified the current condition of the near wellbore, the results indicated that the operator has a number of options to improve oil production while recovering voidage replacement and pore pressure.