Innovative Engineering has been awarded Geomechanical work for Premier Oil in their Catcher Area, being developed and scheduled for production in 2018. Based on a large set of models developed for the field, the work investigates the fracturing limits of the reservoir and seals under the expected water injection conditions for the reservoir. Based on the results of the work, Premier Oil can then set operational limits for the wells and select the required injection equipment accordingly.